Massachusetts Institute of Technology, Central Heating Cooling and Cogeneration Plant
|
Cambridge, MA
Upgrades to the central heating plant included a 60,000 lb/hr temporary boiler, a new 150 MM Btu/hr hot water conversion plant to serve a new hot water distribution, combustion inlet air cooling for the ABB GT-10 20 MW cogen plant, addition of 4,000 tons of cooling and reparation of the 16.5 CUP cogen expansion package consisting of three Solar Taurus 60 combustion turbine units with HRSG.